Concrete floors or screeds need sufficient time to dry before you can start installing your quick step laminate floor on top.
Screed drying time wooden floor. The time it takes for any screed to dry is purely based on surrounding conditions. 75mm screed drying time would be 110 days. It is also important to acclimatise the subfloor before laying the wood flooring. However in all cases the humidity levels in the screed should be monitored at regular intervals to ensure that it is at an acceptable limit before the flooring is installed.
Bs 8203 estimates the drying time for a sand cement screed as one day for each millimetre of screed thickness up to 50mm thick. Time before walking on a screed floor walk on time refers to the time the floor is suitable for light low impact foot traffic. Run the underfloor heating through a complete cycle. Most screeds recommend 24 48 hours.
Ceramic floor tiles can be laid in 3 days if the thickness of the screed is not more than 5 cm. Some more modern screed floors will have a shorter walk on time as little as 12 hours. After 4 hours grasping occurs. With ardex rapid drying floor screeds the area can be walked on in as little as 3 hours and floorcoverings can be installed in as little as 4 hours regardless of thickness.
As a rule of the thumb you should wait one week per cm of screed thickness up to 4 cm. These are traditional screeds and are suitable for all applications provided they are specified correctly. Gypsum solutions dry quickly. Bs 8201 advises a drying period of one day per millimetre for the first 50mm with a longer period being allowed for thicker screeds.
75mm screed drying time would be 21 days. Wait twice as long for every additional cm thickness up to 6 cm and wait 4 weeks for every additional cm beyond 6 cm. Traditional sand cement and anhydrite floor screeds dry at a rate of 1mm per day meaning months of drying before subsequent work can begin. Make sure the screed is dry.
The biggest drawback is the drying time. When laying a screed for the express purpose of installing wood flooring it is essential that a damp proof membrane be. The drying time of the floor screed depends on the composition of the mixture. Whenever and wherever a wood floor is to be installed it is essential to make sure that all materials including concrete and screeds are dry.
Moisture migrates from the bottom to the surface. But the flooring can only be done after 7 days. Liquid screed fast drying cementitious belitex 14 21 days. Traditional sand and cement 1 3 1 4 mixes 1 50mm 1mm per day 50mm plus the british standard states one day should be allowed for each millimetre of thickness for the first 50mm.
During this time the screed is maturing. Refer to the manufacturers guidelines.